Go Back

Agile Design Process

What is an agile design process?

An agile design process applies agile principles to design work: small, iterative cycles, close collaboration with development and product, and continuous feedback from users and stakeholders. Design is integrated into sprints or discovery so it evolves with the product instead of being a big upfront phase.

Use it when: you’re working in or with an agile delivery team and want design to keep pace with development, test ideas early, and stay aligned with user research and continuous discovery.

Copy/paste checklist (design in agile)

  • [ ] Design ahead of build – At least one sprint or iteration so dev has something to implement.
  • [ ] Shared backlog – Design and dev work from the same user stories or backlog items.
  • [ ] Regular user contactUsability testing, interviews, or feedback built into the rhythm (e.g. per sprint or per release).
  • [ ] Definition of done – Design is “done” when it’s testable or implementable; not when it’s “perfect.”
  • [ ] Retrospectives – Include design in retros so the process improves.

Why agile design matters

  • Keeps design and development aligned so handoff and rework are reduced.
  • Delivers value in small increments so you learn from real use and feedback.
  • Reduces the risk of big, late design reveals by testing and shipping often.
  • Supports iterative design and feedback loops as a habit.

What good agile design includes

Checklist

  • [ ] Design in the loop – Designers are part of the team (or tightly coupled); not a separate phase.
  • [ ] Just-in-time design – Enough design for the current sprint or slice; avoid designing months ahead with no feedback.
  • [ ] User feedbackUsability testing or research at a regular cadence, not only at the start.
  • [ ] Shared understandingUser stories, problem statements, or acceptance criteria that design and dev share.
  • [ ] Discovery when needed – Space for continuous discovery or discovery sprints when the problem is unclear.

Common formats

  • Dual-track: Discovery (research, design exploration) and delivery (implementation) run in parallel. Discovery feeds the backlog; delivery builds from it.
  • Design in sprint: Design work is part of the same sprint as build; designer works one sprint ahead or in parallel.
  • Sprint zero / discovery sprint: Dedicated time for research and design before feature work starts. Use when the problem or scope is fuzzy.

Examples

Example (the realistic one)

The team runs 2-week sprints. Design maintains a “ready” column: user stories with wireframes or prototypes and acceptance criteria so dev can implement. Each sprint, one usability test runs on the last release or a prototype; findings go into the backlog. Design and dev attend the same planning and retro so design stays in sync with delivery.

Common pitfalls

  • Design too far ahead: Months of designs with no user or dev feedback. → Do this instead: Design enough for the next 1–2 sprints; validate with users and adjust.
  • No user feedback in sprints: Research only at the start of the year. → Do this instead: Build in a regular cadence (e.g. usability testing or interviews per sprint or per release).
  • Design as a separate phase: “Design will hand off when they’re done.” → Do this instead: Integrate design into the team; use a shared backlog and definition of done.
  • Skipping discovery: Only delivery; no time for problem framing or user research. → Do this instead: Protect discovery time (dual-track or discovery sprints) when the problem or user need is unclear.
  • Agile design vs agile development: Agile development is the delivery framework; agile design is design work done in that framework (iterative, collaborative, feedback-driven).
  • Agile design vs design sprint: A design sprint is a time-boxed design-and-test cycle; agile design is the ongoing integration of design into agile delivery.
  • Agile design vs lean UX: Lean UX emphasises hypotheses, experiments, and learning; agile design is the structural fit of design into agile. They complement each other.

Next step

If design is separate from your agile process, try one change: add one usability test or user interview per sprint and feed findings into the backlog. If you’re already integrated, read Continuous discovery to strengthen the discovery side.